MINE SERRA PELADA PROJECT, BRAZIL

CLIENT: HATCH PERIOD: 2013 SCOPE: Expert consultancy for the repair of a collapse during the excavation of the mine access tunnel. Consultancy on poor quality rock excavation methodologies. STAGE: Construction

TRAINING PROGRAM I AND II OF UNDERGROUND WORKS

CLIENT: MOP (SYSTEM OF ROADS) PERIOD: 2017 y 2019 SCOPE: “Introduction to Tunnel Design” course for professionals at the Ministry of Public Works, Roads department. STAGE: Planning

ANDINA MINE, CONSULTANCY FOR PDA PROJECT PHASE I

CLIENT: CODELCO PERIOD: 2008-2009 SCOPE: Technical and operational consultancy to increase productivity. Implementation of construction technologies and methodologies in the underground excavations of the PDS Project Phase I. STAGE: Construction

TRAINING PROGRAM IN UNDERGROUND PROJECT MANAGEMENT

CLIENT: CODELCO PERIOD: 2011-2012 SCOPE: Training program to provide the client with cutting-edge and standardized knowledge of good practices in the different areas of an underground project. STAGE: Planning

GROUND CONTROL MANAGEMENT PLAN

CLIENT: NYRSTAR PERIOD: 2011 SCOPE: Development of the Ground Control Management Plan (GCMP), a document that stablishes the principles of design and monitoring of the layout and support of mine excavation to maximize the safety and stability of the rock mass. STAGE: Operation

CHACABUCO TUNNEL TECHNICAL INSPECTION

CLIENT: SOCIEDAD CONCESIONARIA AUTOPISTA LOS LIBERTADORES PERIOD: 2018 SCOPE:Geotechnical and structural inspection of the tunnel and expert judgement regarding the situation of the tunnel. STAGE: Operation

MARINE WORKS ENGINEERING DESALINATION PLANT INCO MINERA LOS PELAMBRES PROJECT

CLIENT: ANTOFAGASTA MINERALS PERIOD: 2018-2020 SCOPE: Detailed engineering of subsea tunnels with Micro TBM and launching shaft. Supervision of the geotechnical campaign with off-shore drilling and directional core drilling. Technical advice during tender process. Construction Supervision. STAGE: Design, tender and construction

EPRIL HYDROPOWER PLANT PROJECT

CLIENT: POCH S.A. PERIOD: 2014-2015 SCOPE: Geological-geotechnical study for the project. Detailed engineering of underground works. STAGE: Design