TRAINING PROGRAM I AND II OF UNDERGROUND WORKS

CLIENT: MOP (SYSTEM OF ROADS) PERIOD: 2017 y 2019 SCOPE: “Introduction to Tunnel Design” course for professionals at the Ministry of Public Works, Roads department. STAGE: Planning
EL MELON II TUNNEL PROJECT

CLIENT: SOCIEDAD CONCESIONARIA TÚNELEL MELÓN II S.A. PERIOD: 2016-2019 SCOPE: Detailed engineering of the El Melon II Tunnel and upgrade of the El Melon I. Site engineering in the excavation of Tunnel II. STAGE: Design – Construction
CHACABUCO TUNNEL TECHNICAL INSPECTION

CLIENT: SOCIEDAD CONCESIONARIA AUTOPISTA LOS LIBERTADORES PERIOD: 2018 SCOPE:Geotechnical and structural inspection of the tunnel and expert judgement regarding the situation of the tunnel. STAGE: Operation
LINE 3 METRO EXTENSION GEOTECHNICAL ASESSEMENT

CLIENT: OHL PERIOD: 2018 SCOPE: Feasibility engineering for alternative design for the interstation tunnels to extend Line 3 of Metro Santiago. STAGE: Design