CLIENT: NYRSTAR
PERIOD: 2011
SCOPE: Development of the Ground Control Management Plan (GCMP), a document that stablishes the principles of design and monitoring of the layout and support of mine excavation to maximize the safety and stability of the rock mass.
STAGE: Operation